Notification of Completion - CD Project 1.11 - General Electric at SDWWTP.pdf
|
11/15/2024 |
11/15/2024 |
2024 Quarterly Report No. 3.pdf
|
10/31/2024 |
10/31/2024 |
Force Majeure Delay Notification - Tropical Storm Warning due to Hurricane Milton.pdf
|
10/21/2024 |
10/21/2024 |
Additional Time Extension Request for Payment of EPA-FDEP Demand for Stipulated Penalties.pdf
|
9/19/2024 |
9/19/2024 |
Force Majeure Delay Notification CD 1.3 Oxygenation Trains at SDWWTP.pdf
|
8/28/2024 |
8/28/2024 |
Time Extension Request for Payment of EPA-FDEP Demand for Stipulated Penalties (2021-2023).pdf
|
8/22/2024 |
8/22/2024 |
2024 Quarterly Report No. 2.pdf
|
7/26/2024 |
7/26/2024 |
7th Annual FOG Control Program Review Report.pdf
|
6/28/2024 |
6/28/2024 |
Request to Waive Stipulated Penalties for CD 5.2 - Decommissioning of PS0691.pdf
|
6/7/2024 |
6/7/2024 |
Request to Waive Potential Stipulated Penalties for CD 5.5 - Pump Station 0415.pdf
|
6/7/2024 |
6/7/2024 |
2024 Quarterly Report No. 1.pdf
|
5/1/2024 |
5/1/2024 |
Request to Waive Stipulated Penalties for CD 2.2 - Building Improvements at CDWWTP.pdf
|
3/27/2024 |
3/27/2024 |
2023 Annual Report.pdf
|
3/2/2024 |
3/2/2024 |
2023 Semi-Annual Report No. 2.pdf
|
2/1/2024 |
2/1/2024 |
2023 Quarterly Report No. 4.pdf
|
1/31/2024 |
1/31/2024 |
Delay Notification and Time Extension Request for CD 2.7, 2.8 and 2.9 - Secondary Clarifiers and RS Pump Station at CDWWTP.pdf
|
11/15/2023 |
11/15/2023 |
Revised Force Majeure Delay Notification and Request for Time Extension CD 1.7 Digesters and Control Bldg.pdf
|
10/31/2023 |
10/31/2023 |
2023 Quarterly Report No. 3.pdf
|
10/30/2023 |
10/30/2023 |
Completion Notification for CD 1.2 Oxygen Production at SDWWTP.pdf
|
10/27/2023 |
10/27/2023 |
PDR Test.pdf
|
10/26/2023 |
10/26/2023 |
Payment of 2023 FDEP Demand for SSO Stipulated Penalties.pdf
|
10/24/2023 |
10/24/2023 |
Force Majeure Delay Notification and Request for Time Extension CD 1.7 Digesters and Control Bldg.pdf
|
10/20/2023 |
10/20/2023 |
Completion Notification for CD 2.1 - Electrical Improvements at CDWWTP.pdf
|
10/6/2023 |
10/6/2023 |
Completion Notification for CD 2.22 - PS2 at CDWWTP.pdf
|
10/6/2023 |
10/6/2023 |
Request to Waive Stipulated Penalties for CD 5.1 - Pump Station 0418.pdf
|
9/8/2023 |
9/8/2023 |
2023 Quarterly Report No. 2.pdf
|
7/31/2023 |
7/31/2023 |
2023 Semi-Annual Report No.1.pdf
|
7/31/2023 |
7/31/2023 |
6th Annual FOG Control Program Review Report.pdf
|
6/30/2023 |
6/30/2023 |
Request for Time Extension and Project Status Update for CD CIP 2.15.pdf
|
6/16/2023 |
6/16/2023 |
Force Majeure Delay Notification - TS Warning (Hurricane Ian) Follow-up Letter.pdf
|
6/6/2023 |
6/6/2023 |
2023 Quarterly Report No. 1.pdf
|
5/1/2023 |
5/1/2023 |
Request to Waive Stipulated Penalties for CD 5.3 - Pump Station 0692.pdf
|
4/19/2023 |
4/19/2023 |
Request to Waive Stipulated Penalties for CD 3.6 - Disinfection at NDWWTP.pdf
|
3/2/2023 |
3/2/2023 |
2022 Annual Report.pdf
|
3/1/2023 |
3/1/2023 |
2022 Quarterly Report No. 4.pdf
|
1/31/2023 |
1/31/2023 |
2022 Semi-Annual Report No. 2.pdf
|
1/31/2023 |
1/31/2023 |
Request to Waive Stipulated Penalties due to Force Majeure Delay - CD 5.9.pdf
|
1/30/2023 |
1/30/2023 |
Request for Time Extension and Project Status Update for CD 1.6, 1.8, 2.12, 2.13, 2.16 & 2.18.pdf
|
12/28/2022 |
12/28/2022 |
Request for Time Extension due to Force Majeure for CD 1.5 - Effluent PS.pdf
|
12/7/2022 |
12/7/2022 |
Potential Force Majeure Notification - Subtropical Storm Nicole.pdf
|
11/22/2022 |
11/22/2022 |
Force Majeure Delay Notification For CD CIP 3.3 and 3.4.pdf
|
11/4/2022 |
11/4/2022 |
2022 Quarterly Report No. 3.pdf
|
10/31/2022 |
10/31/2022 |
Force Majeure Delay Notification - Tropical Storm Warning due to Hurricane Ian.pdf
|
10/12/2022 |
10/12/2022 |
2022 Quarterly Report No. 2.pdf
|
7/29/2022 |
7/29/2022 |
2022 Semi-Annual Report No. 1.pdf
|
7/29/2022 |
7/29/2022 |
Payment of Amended Demand for Stipulated Penalties (SSO) 2019-2020.pdf
|
7/20/2022 |
7/20/2022 |
5th Annual FOG Control Program Review Report.pdf
|
6/28/2022 |
6/28/2022 |
Completion Notification for CD 3.6 Disinfection at NDWWTP.pdf
|
6/24/2022 |
6/24/2022 |
Notification of Completion for CD CIP 1.5 Effluent Pump Station at SDWWTP.pdf
|
6/2/2022 |
6/2/2022 |
Response to EPA's Request for Additional Information on CD Projects with Force Majeure and Delay Notifications.pdf
|
5/2/2022 |
5/2/2022 |
2022 Quarterly Report No. 1.pdf
|
5/2/2022 |
5/2/2022 |
Payment of 2021 FDEP Demand for Stipulated Penalties.pdf
|
4/13/2022 |
4/13/2022 |
Request for Time Extension and Project Status Update Notification for CD CIP 1.5 - Effluent PS SDWWTP.pdf
|
4/7/2022 |
4/7/2022 |
2021 Annual Report.pdf
|
3/1/2022 |
3/1/2022 |
Failure to Meet Compliance Date Notification CD CIP 1.2-Oxygen Production.pdf
|
2/25/2022 |
2/25/2022 |
30-Day Extension for Payment of EPA and FDEP Demand for SSO Stipulated Penalties (2019-2020).pdf
|
2/18/2022 |
2/18/2022 |
2021 Semi-Annual Report No. 2.pdf
|
1/31/2022 |
1/31/2022 |
2021 Quarterly Report No. 4.pdf
|
1/31/2022 |
1/31/2022 |
Force Majeure Delay Notification for CD CIP 5.9 - New PS 0301.pdf
|
1/28/2022 |
1/28/2022 |
Failure to Meet Compliance Date Notification CD CIP 5.9 - PS No. 0301.pdf
|
1/24/2022 |
1/24/2022 |
Supplemental Letter to the 2021 Quarterly Report No. 3.pdf
|
12/3/2021 |
12/3/2021 |
Potential Delay for CD CIP 1.5 - Effluent Pump Station.pdf
|
10/29/2021 |
10/29/2021 |
2021 Quarterly Report No. 3.pdf
|
10/29/2021 |
10/29/2021 |
FDEP Annual Payment for CD Compliance Monitoring.pdf
|
8/27/2021 |
8/27/2021 |
Consent Decree Outstanding Force Majeure and Potential Delay Notifications.pdf
|
8/13/2021 |
8/13/2021 |
2021 Semi-Annual Report No. 1.pdf
|
7/30/2021 |
7/30/2021 |
2021 Quarterly Report No. 2.pdf
|
7/30/2021 |
7/30/2021 |
Potential Delay Notification CD CIP 1.2 Oxygen Production.pdf
|
7/14/2021 |
7/14/2021 |
4th Annual FOG Control Program Review Report.pdf
|
6/30/2021 |
6/30/2021 |
L20210602FDEP-AnnualPayment of 55000 Trasmittal Letter.pdf
|
6/30/2021 |
6/30/2021 |
Failure to meet compliance date CD CIP 2.1 - Electrical Improvements.pdf
|
6/14/2021 |
6/14/2021 |
Proof of Payment for 2020 FDEP SSO Penalties Transmittal Letter.pdf
|
6/9/2021 |
6/9/2021 |
2021 Quarterly Report No. 1.pdf
|
4/30/2021 |
4/30/2021 |
Revised CMOM Programs Consolidated Schedule of Implementation Activities.pdf
|
3/19/2021 |
3/19/2021 |
Failure to Meet Compliance Date and Update for CD CIP 1.11 General Electrical.pdf
|
3/17/2021 |
3/17/2021 |
2020 Annual Report_Final.pdf
|
3/1/2021 |
3/1/2021 |
Potential Delay Notification for CD CIP 2.11 - Effluent Pump Station.pdf
|
2/11/2021 |
2/11/2021 |
2020 Quarterly Report No 4.pdf
|
1/27/2021 |
1/27/2021 |
Revised 2020 Quarterly Report No 3.pdf
|
1/27/2021 |
1/27/2021 |
2020 Semi-Annual Report No 2.pdf
|
1/26/2021 |
1/26/2021 |
Potential Delay Update for CD CIP 1.11 - General Electrical.pdf
|
1/15/2021 |
1/15/2021 |
Completion Notification for CD 5.3 Upgrade of PS 0692.pdf
|
11/20/2020 |
11/20/2020 |
Potential Force Majeure due Tropical Storm Eta.pdf
|
11/20/2020 |
11/20/2020 |
2020 Quarterly Report No. 3.pdf
|
10/30/2020 |
10/30/2020 |
Potential Delay Notification for CD CIP 2.1 Electrical Improvements.pdf
|
10/13/2020 |
10/13/2020 |
CD 4.9 AC Force Main Completion Letter.pdf
|
10/7/2020 |
10/7/2020 |
3rd Annual FOG Control Program Review Report.pdf
|
9/29/2020 |
9/29/2020 |
Revised Abeyance of Requirements under Section 24-42.6 of the Code of Miami-Dade County.pdf
|
9/22/2020 |
9/22/2020 |
Request for Time Extension Hurricane Isaias Force Majeure.pdf
|
9/14/2020 |
9/14/2020 |
Potential Delay Notification for CD CIP 2.15(3) Plant 2 Digesters Cluster 3 at CD WWTP.pdf
|
9/10/2020 |
9/10/2020 |
Failure to Meet Compliance Date and Project Update for CD CIP 3.6 - Disinfection at ND WWTP.pdf
|
9/9/2020 |
9/9/2020 |
Abeyance of Requirements under Section 24-42.6 of the Code of Miami-Dade County.pdf
|
8/27/2020 |
8/27/2020 |
Potential Force Majeure due to Hurricane Isaias.pdf
|
8/13/2020 |
8/13/2020 |
Payment of 2019 FDEP Demand for Stipulated Penalties Transmittal Letter.pdf
|
8/13/2020 |
8/13/2020 |
2020 Semi-Annual Report No.1.pdf
|
7/30/2020 |
7/30/2020 |
2020 Quarterly Report No. 2.pdf
|
7/30/2020 |
7/30/2020 |
Third Annual FOG Control Program Review Report Delay Notification.pdf
|
7/22/2020 |
7/22/2020 |
Failure to Meet Compliance Date and Project Status Update for CD 5.3 - Upgrade PS 0692.pdf
|
6/16/2020 |
6/16/2020 |
Failure to Meet Compliance Date Delay and Project Status Update Notification for CD CIP 2.19 Co-Gen Facility.pdf
|
5/21/2020 |
5/21/2020 |
Force Majeure Delay Notification for CD CIP 3.6 - Disinfection.pdf
|
5/5/2020 |
5/5/2020 |
Force Majeure Delay Notification for CD CIP 5.3 - PS 0692.pdf
|
5/5/2020 |
5/5/2020 |
2020 Quarterly Report No. 1.pdf
|
4/30/2020 |
4/30/2020 |
Project Status Update for CD CIP 2.22 - PS 2 at CDWWTP.pdf
|
4/24/2020 |
4/24/2020 |
Force Majeure Notification due to the COVID-19 Impacts.pdf
|
4/3/2020 |
4/3/2020 |
30-Day Extension for Payment of FDEP Demand for SSO Stipulated Penalties (2019).pdf
|
3/12/2020 |
3/12/2020 |
Notification of Completion for CD CIP 2.2 - Building Improvements at CD WWTP.pdf
|
3/5/2020 |
3/5/2020 |
2019 Annual Report.pdf
|
3/2/2020 |
3/2/2020 |
2019 Semi-Annual Report No. 2.pdf
|
1/31/2020 |
1/31/2020 |
2019 Quarterly Report No. 4.pdf
|
1/31/2020 |
1/31/2020 |
Payment of FDEP Demand for Stipulated Penalties (2017 & 2018).pdf
|
1/16/2020 |
1/16/2020 |
Delay Notification for CD CIP 2.19 Co-Gen Facility.pdf
|
1/10/2020 |
1/10/2020 |
Notification of Completion for CD 5.5 - PS 0415.pdf
|
12/30/2019 |
12/30/2019 |
Notification of Completion for CD 5.1 - PS 0418.pdf
|
12/30/2019 |
12/30/2019 |
SEP Completion Report.pdf
|
12/18/2019 |
12/18/2019 |
Notification of Completion for CD 5.2-Decommissioning of PS 0691.pdf
|
12/5/2019 |
4/9/2020 |
2019 Quarterly Report No. 3.pdf
|
10/30/2019 |
10/30/2019 |
Delay Notification and Failure to Meet Compliance Date for CD CIP 5.1 - PS 0418.pdf
|
10/21/2019 |
10/21/2019 |
Public Document Repository Breach in Compliance.pdf
|
10/4/2019 |
10/4/2019 |
Failure to Meet Compliance Date for CD CIP 5.5 - PS 0415.pdf
|
10/2/2019 |
10/3/2019 |
Project Update and Failure to Meet Compliance Date Notification for CD 2.2(2).pdf
|
9/26/2019 |
9/30/2019 |
Potential Force Majeure due to Hurricane Dorian.pdf
|
9/13/2019 |
9/13/2019 |
2019 Semi-Annual Report No. 1.pdf
|
7/30/2019 |
9/12/2019 |
2019 Quarterly Report No. 2.pdf
|
7/30/2019 |
9/12/2019 |
Second Annual FOG Control Program Review Report.pdf
|
6/28/2019 |
9/12/2019 |
Potential Delay Notification for CD CIP 1.11(1.1).pdf
|
6/28/2019 |
9/12/2019 |
Payment of 2017 & 2018 EPA and FDEP Stipulated Penalties Transmittal Letter.pdf
|
6/13/2019 |
9/12/2019 |
Payment of 2017-2018 FDEP Joint Demand for Stipulated Penalties.pdf
|
6/10/2019 |
9/12/2019 |
Project Update and Failure to Meet CD Compliance Date for CIP 2.22.pdf
|
5/20/2019 |
9/12/2019 |
2019 Quarterly Report No. 1.pdf
|
4/29/2019 |
9/12/2019 |
Delay Notification Letter for CD CIP 2.22.pdf
|
3/6/2019 |
9/12/2019 |
2018 Annual Report.pdf
|
3/1/2019 |
9/12/2019 |
2018 Semi-Annual Report No. 2.pdf
|
1/31/2019 |
9/12/2019 |
2018 Quarterly Report No. 4.pdf
|
1/29/2019 |
9/12/2019 |
Potential Delay Notification Letter for CD CIP 2.2(2).pdf
|
1/22/2019 |
9/12/2019 |
Force Majeure Notification Letter for CD CIP 5.2.pdf
|
11/29/2018 |
9/12/2019 |
2018 Quarterly Report No. 3.pdf
|
10/30/2018 |
9/12/2019 |
CMOM Programs Consolidated Schedule of Implementation Activities.pdf
|
8/6/2018 |
9/12/2019 |
Wastewater Treatment Plant Operations and Maintenance Program Final.pdf
|
8/6/2018 |
9/12/2019 |
2018 Semi-Annual Report No. 1.pdf
|
7/30/2018 |
9/12/2019 |
2018 Quarterly Report No. 2.pdf
|
7/26/2018 |
9/12/2019 |
Force Main Criticality Assessment and Prioritization Report.pdf
|
7/17/2018 |
9/12/2019 |
First Annual FOG Control Prorgam Review Report.pdf
|
6/28/2018 |
9/12/2019 |
Force Majeure Notification for CD CIPs 1.6, 1.8, 2.12, 2.13, 2.16 and 2.18.pdf
|
6/6/2018 |
9/12/2019 |
Request for Material Change - CD CIP 2.14.pdf
|
5/21/2018 |
9/12/2019 |
2018 Quarterly Report No. 1.pdf
|
4/30/2018 |
9/12/2019 |
Potential Delay Notification for CD CIP 5.1_.pdf
|
3/28/2018 |
9/12/2019 |
2017 Annual Report.pdf
|
3/1/2018 |
9/12/2019 |
Potential Delay Notification for CD CIP 5.18.pdf
|
2/23/2018 |
9/12/2019 |
Potential Delay Notification for CD CIP 2.5.pdf
|
2/13/2018 |
9/12/2019 |
Response to EPA and FDEP Comments Hauled Waste Manual.pdf
|
2/13/2018 |
9/12/2019 |
Notification of Completion for CD 5.16(1).pdf
|
2/2/2018 |
9/12/2019 |
Delay Notification for CD CIP 4.10.pdf
|
2/1/2018 |
9/12/2019 |
2017 Semi-Annual Report No. 2.pdf
|
1/31/2018 |
9/12/2019 |
2017 Quarterly Report No. 4.pdf
|
1/30/2018 |
9/12/2019 |
Response to EPA and FDEP Request for Additional Information on WWTP OMP.pdf
|
1/29/2018 |
9/12/2019 |
Failure to Meet Compliance Date for CD CIP 5.17.pdf
|
1/10/2018 |
9/12/2019 |
Payment for 2016 FDEP Demand for Stipulated Penalties.pdf
|
1/5/2018 |
9/12/2019 |
Request for CD CIP and SEP Schedule Modification.pdf
|
12/22/2017 |
9/12/2019 |
Potential Delay Notification for CD CIP 5.7.pdf
|
12/15/2017 |
9/12/2019 |
Potential Delay Notification for CD CIP 2.27.pdf
|
12/15/2017 |
9/12/2019 |
Potential Delay Notification for CD CIP 5.1.pdf
|
12/13/2017 |
9/12/2019 |
Delay Notification for CD CIP 5.11.pdf
|
12/11/2017 |
9/12/2019 |
Failure to Meet Compliance Date for CD CIP 4.5.pdf
|
12/7/2017 |
9/12/2019 |
Delay Notification for CD CIP 5.17.pdf
|
12/5/2017 |
9/12/2019 |
Delay Notification for CD CIP 2.4.pdf
|
11/28/2017 |
9/12/2019 |
Delay Notification for CD CIP 5.12.pdf
|
11/28/2017 |
9/12/2019 |
Delay Notification for CD CIP 5.4.pdf
|
11/21/2017 |
9/12/2019 |
Financial Analysis Program (Final).pdf
|
11/16/2017 |
9/12/2019 |
Gravity Sewer System Operations and Maintenance Program (Final).pdf
|
11/14/2017 |
9/12/2019 |
Information Management System Program (Final).pdf
|
11/14/2017 |
9/12/2019 |
Pump Station Operations and Preventative Maintenance Program (Final).pdf
|
11/14/2017 |
9/12/2019 |
Sewer System Asset Management Program (Final).pdf
|
11/14/2017 |
9/12/2019 |
Force Main Operations Preventative Maintenance and Assessment Rehabilitation Program (Final).pdf
|
11/14/2017 |
9/12/2019 |
Delay Notification for CD CIP 5.6.pdf
|
11/9/2017 |
9/12/2019 |
Failure to Meet CD Compliance Date for CD CIP 2.3.pdf
|
11/7/2017 |
9/12/2019 |
Force Majeure - Hurricane Irma Follow up Letter.pdf
|
11/7/2017 |
9/12/2019 |
Status Update for CD CIP 2.2 CDWWTP Building Improvements Letter.pdf
|
11/3/2017 |
9/12/2019 |
Force Main Rehabilitation-Replacement Program (Final).pdf
|
11/1/2017 |
9/12/2019 |
Delay Notification of CD CIP 1.2 Letter.pdf
|
10/31/2017 |
9/12/2019 |
Hauled Waste Manifest Guidance Manual.pdf
|
10/31/2017 |
9/12/2019 |
2017 Quarterly Report No. 3.pdf
|
10/30/2017 |
9/12/2019 |
CD CIP 2.22 Status Update Letter.pdf
|
10/19/2017 |
9/12/2019 |
Fats, Oils and Grease Control Program (Final).pdf
|
10/18/2017 |
9/12/2019 |
Response to EPA and FDEP Comments on the SOP for Calculating Recovered SSO Volume.pdf
|
10/17/2017 |
9/12/2019 |
Delay Notification Letter for CD Appendix D-2, CIP 4.5.pdf
|
10/10/2017 |
9/12/2019 |
Notification of Completion for CD 2.24.pdf
|
9/29/2017 |
9/12/2019 |
Update on Delay of CD CIP 5.16 Notification Letter.pdf
|
9/22/2017 |
9/12/2019 |
Force Majeure Notification Letter Hurricane Irma.pdf
|
9/20/2017 |
9/12/2019 |
Sewer Overflow Response Plan_.pdf
|
9/18/2017 |
9/12/2019 |
Clarification of Maintenance of Outfall Contained in WWTP OMP.pdf
|
8/30/2017 |
9/12/2019 |
Delay Notification Letter for CD Appendix D-2, CIP 2.17.pdf
|
8/17/2017 |
9/12/2019 |
2017 Quarterly Report No. 2.pdf
|
7/31/2017 |
9/12/2019 |
2017 Semi-Annual Report No. 1.pdf
|
7/31/2017 |
9/12/2019 |
Scope Modification Request for CD CIP 5.09 Letter.pdf
|
7/28/2017 |
9/12/2019 |
2017 Request for Modifications of Non-Material Changes to Interim Milestones Report No. 6.pdf
|
7/28/2017 |
9/12/2019 |
2017 Request for Modifications of Non-Material Changes to Interim Milestones Report No. 5.pdf
|
6/29/2017 |
9/12/2019 |
Notification of Completion for CD CIP 4.08.pdf
|
6/27/2017 |
9/12/2019 |
Force Majeure Notification Letter for CD Appendix D-2, CIP 2.22.pdf
|
6/1/2017 |
9/12/2019 |
Potential Delay Notification Letter for Consent Decree Appendix D-2, CIP 2.19.pdf
|
5/18/2017 |
9/12/2019 |
Response to EPA and FDEP Comments on Force Main Operations, Preventative Maintenance and Assessment-Rehabilitation Program.pdf
|
5/17/2017 |
9/12/2019 |
Response to EPA and FDEP Comments on Force Main Rehabilitation-Replacement Program.pdf
|
5/17/2017 |
9/12/2019 |
Response to EPA and FDEP Comments on the Information Management System Program.pdf
|
5/17/2017 |
9/12/2019 |
2017 Request for Modifications of Non-Material Changes to Interim Milestones Report No. 4.pdf
|
5/16/2017 |
9/12/2019 |
Force Majeure Notification Letter for CD CIP 4.08.pdf
|
5/16/2017 |
9/12/2019 |
Force Majeure Notification for CD CIP 2.02.pdf
|
5/11/2017 |
9/12/2019 |
2017 Quarterly Report No. 1.pdf
|
5/1/2017 |
9/12/2019 |
Response to the EPA and FDEP Comments in the FOG Control Program.pdf
|
5/1/2017 |
9/12/2019 |
Failure to Meet CD Compliance Date for CIP 4.8.pdf
|
4/14/2017 |
9/12/2019 |
Force Majeure Notification Letter for CD CIP 1.02.pdf
|
4/10/2017 |
9/12/2019 |
GSS Evaluation of Corrosion Control Options Report.pdf
|
3/31/2017 |
9/12/2019 |
Request for Schedule Extension of CD CIP Projects 1.8, 2.13 and 2.18(2) Resubmittal.pdf
|
3/31/2017 |
9/12/2019 |
2017 Request for Modifications of Non-Material Changes to Interim Milestones Report No. 3.pdf
|
3/30/2017 |
9/12/2019 |
Payment of 2017 FDEP Demand for Stipulated Penalties.pdf
|
3/30/2017 |
9/12/2019 |
Payment of 2017 EPA and FDEP Stipulated Penalties.pdf
|
3/29/2017 |
9/12/2019 |
Response to EPA and FDEP Comments on the Sewer Overflow Response Plan.pdf
|
3/28/2017 |
9/12/2019 |
Response to EPA and FDEP Comments on the Sewer System Asset Management Program.pdf
|
3/28/2017 |
9/12/2019 |
Request for Schedule Extension of CD CIP Projects 1.08, 2.13, and 2.18(3).pdf
|
3/15/2017 |
9/12/2019 |
2016 Annual Report.pdf
|
3/1/2017 |
9/12/2019 |
2017 Request for Modification of Non-Material Changes to Interim Milestones Report No. 2.pdf
|
2/28/2017 |
9/12/2019 |
Force Majeure due to Hurricane Matthew Notification Letter.pdf
|
2/21/2017 |
9/12/2019 |
Response to EPA and FDEP Comments on CD CIP 4.8 Force Majeure Notification and Follow-up Letter.pdf
|
2/7/2017 |
9/12/2019 |
2016 Quarterly Report No. 4.pdf
|
1/31/2017 |
9/12/2019 |
2017 Request for Modifications of Non-Material Changes to Interim Milestones Report No. 1.pdf
|
1/31/2017 |
9/12/2019 |
2016 Semi-Annual Report No. 2.pdf
|
1/31/2017 |
9/12/2019 |
Force Majeure Notification Letter for CD Appendix D-2, CIP 1.09.pdf
|
1/27/2017 |
9/12/2019 |
Delay of CD CIP 5.16(1) Upgrade of PS No. 0198 to EPA.pdf
|
1/27/2017 |
9/12/2019 |
Potential Delay Notification Letter for CD CIP 4.8.pdf
|
1/18/2017 |
9/12/2019 |
Potential Failure to Meet CD Compliance Date for CIP 5.16.pdf
|
12/23/2016 |
9/12/2019 |
2016 Request for Modifications of Non-Material Changes to Interim Milestones Report No. 5.pdf
|
12/21/2016 |
9/12/2019 |
Payment of 2016 FDEP Demand for Stipulated Penalties.pdf
|
12/6/2016 |
9/12/2019 |
Response to EPA and FDEP Comments on WWTP OMP.pdf
|
11/21/2016 |
9/12/2019 |
2016 Quarterly report No. 3.pdf
|
10/28/2016 |
9/12/2019 |
Force Majeure Notification Letter_Hurricane Matthew.pdf
|
10/19/2016 |
9/12/2019 |
Payment of 2016 EPA-FDEP Stipulated Penalties.pdf
|
10/14/2016 |
9/12/2019 |
2016 Request for Modification of Non-Material Changes to Interim Milestones Report No. 4.pdf
|
10/5/2016 |
9/12/2019 |
Force Majeure Follow-up Letter for Consent Decree Appendix D-2, CIP 4.8.pdf
|
9/30/2016 |
9/12/2019 |
Force Majeure Notification Letter for CD Appendix D-2 CIP 4.8.pdf
|
9/8/2016 |
9/12/2019 |
Response to EPA and FDEP Comments on GSSOMP.pdf
|
8/12/2016 |
9/12/2019 |
2016 Request for Modification of Non-Material Changes to Interim Milestones Report No. 3.pdf
|
8/8/2016 |
9/12/2019 |
2016 Semi-Annual Report No. 1.pdf
|
7/31/2016 |
9/12/2019 |
Response to EPA-FDEP Comments on PSOPMP.pdf
|
7/29/2016 |
9/12/2019 |
2016 Quarterly Report No. 2.pdf
|
7/29/2016 |
9/12/2019 |
2016 Request for Modifications of Non-Material Changes to Interim Milestones Report No. 2.pdf
|
6/3/2016 |
9/12/2019 |
Request for Non-Material Change CD Project 2.15.pdf
|
5/13/2016 |
9/12/2019 |
2016 Quarterly Report No. 1.pdf
|
4/29/2016 |
9/12/2019 |
2016 Request for Modification to Interim Milestones Report No. 1.pdf
|
4/4/2016 |
9/12/2019 |
CMOM Programs Consolidated Implementation Schedule.pdf
|
3/31/2016 |
9/12/2019 |
SOP for Calculating Recovered SSO Volume.pdf
|
3/11/2016 |
9/12/2019 |
2015 Annual Report.pdf
|
3/1/2016 |
9/12/2019 |
Request for Non-Material Change CD Project 2.12 and 2.13.pdf
|
2/11/2016 |
9/12/2019 |
Request for Non-Material Change CD Project 1.06.pdf
|
2/8/2016 |
9/12/2019 |
Request for Non-Material Change CD Project 2.14 and 2.15.pdf
|
2/8/2016 |
9/12/2019 |
2015 Semi-Annual Report No. 2.pdf
|
2/1/2016 |
9/12/2019 |
Request for Non-Material Change for Appendix D Change CIP 5.2.pdf
|
2/1/2016 |
9/12/2019 |
Response to EPA and FDEP Comments on Financial Analysis Program.pdf
|
1/29/2016 |
9/12/2019 |
2015 Quarterly Report No. 4.pdf
|
1/28/2016 |
9/12/2019 |
Response to EPA Letter Regarding 2015 Request for Modifications of Non-Material Changes to Interim Milestones in CD Appendix D-2.pdf
|
1/19/2016 |
9/12/2019 |
Notification of Agreement on CMOM Programs Consolidated Schedule of Implementation Activities.pdf
|
1/19/2016 |
9/12/2019 |
Information Management System Program.pdf
|
12/4/2015 |
9/12/2019 |
Force Main Rehabilitation-Replacement Program.pdf
|
12/4/2015 |
9/12/2019 |
Force Majeure Notification Letter CD App D-2 CIP 4.4.pdf
|
11/9/2015 |
9/12/2019 |
2015 Quarterly Report No. 3.pdf
|
10/28/2015 |
9/12/2019 |
Request for Non-Material Change for Supplemental Environmental Project.pdf
|
10/16/2015 |
9/12/2019 |
Sewer System Asset Management Program.pdf
|
10/6/2015 |
9/12/2019 |
Request for Modification of Non-Material Change for Appendix D CIP 2.27.pdf
|
10/2/2015 |
9/12/2019 |
Request for Modification of Non-Material Change for Appendix D CIP 5.11.pdf
|
8/12/2015 |
9/12/2019 |
Force Main Operations, Preventative Maintenance and Assessment-Rehabilitation Program.pdf
|
8/6/2015 |
9/12/2019 |
2015 Quarterly Report No. 2.pdf
|
7/30/2015 |
9/12/2019 |
2015 Semi-Annual Report No. 1.pdf
|
7/30/2015 |
9/12/2019 |
2015 Request for Modifications of Non-Material Changes to Interim Milestones in CD Appendix D-2.pdf
|
7/16/2015 |
9/12/2019 |
Sewer Overflow Response Plan.pdf
|
7/2/2015 |
9/12/2019 |
2015 Request for Modifications of Non-Material Changes to Interim Milestones to CD Appendix D-2.pdf
|
6/26/2015 |
9/12/2019 |
FOG Control Program And Proposed FOG Control Ordinance.pdf
|
6/5/2015 |
9/12/2019 |
Payment of Stipulated Penalties to FDEP for SSOs that did not Reach US Waters.pdf
|
6/2/2015 |
9/12/2019 |
Payment of 2014 EPA and FDEP Stipulated Penalties.pdf
|
5/22/2015 |
9/12/2019 |
Payment of Stipulated Penalties to FDEP for SSOs that Reached US Waters.pdf
|
5/21/2015 |
9/12/2019 |
Wastewater Treatment Plant Operations and Maintenance Program.pdf
|
5/15/2015 |
9/12/2019 |
2015 Quarterly Report No. 1.pdf
|
4/30/2015 |
9/12/2019 |
Force Majeure Closeout Letter for CD Appendix D-2 CIP 4.10.pdf
|
4/24/2015 |
9/12/2019 |
Pump Station Operations and Preventative Maintenance Program.pdf
|
4/2/2015 |
9/12/2019 |
Request for Modifications for Sequence of CDWWTP Plant 2 Digester Clusters.pdf
|
3/5/2015 |
9/12/2019 |
2014 Annual Report.pdf
|
3/2/2015 |
9/12/2019 |
Force Majeure Notification Letter for CD 4.10.pdf
|
2/27/2015 |
9/12/2019 |
Revisions to Proposed Amendments to the Volume Sewer Customer Ordinance.pdf
|
2/24/2015 |
9/12/2019 |
Volume Sewer Customer Ordinance.pdf
|
2/23/2015 |
9/12/2019 |
Gravity Sewer System Operations and Maintenance Program.pdf
|
2/6/2015 |
9/12/2019 |
2014 Semi-Annual Report No. 2.pdf
|
2/2/2015 |
9/12/2019 |
2014 Request for Modification of Interim Milestones Quarterly Report.pdf
|
2/2/2015 |
9/12/2019 |
2014 Quarterly Report No. 4.pdf
|
1/30/2015 |
9/12/2019 |
2014 Annual Update of Unpermitted Discharges Contingency Plan.pdf
|
12/22/2014 |
9/12/2019 |
EPA MDWASD CD Financial Analysis Program.pdf
|
12/5/2014 |
9/12/2019 |
2014 Quarterly Report No. 3.pdf
|
10/27/2014 |
9/12/2019 |
Amendment to 2014 QR No. 1 - Revised SSO Table.pdf
|
9/12/2014 |
9/12/2019 |
2014 Semi-Annual Report No. 1.pdf
|
7/30/2014 |
9/12/2019 |
2014 Quarterly Report No. 1 - Revised Table.pdf
|
7/28/2014 |
9/12/2019 |
2014 Quarterly Report No. 2.pdf
|
7/28/2014 |
9/12/2019 |
2013 Unpermitted Discharges Contingency (Revised) Plan.pdf
|
5/20/2014 |
9/12/2019 |
Amendment to Section 24-42.3 of the Code of Miami-Dade County for Adequate Pumping, Transmission and Treatment Capacity.pdf
|
5/20/2014 |
9/12/2019 |
Civil Penalty Payment to the US Department of Justice.pdf
|
5/7/2014 |
9/12/2019 |
Civil Penalty Payment to FDEP.pdf
|
5/5/2014 |
9/12/2019 |
2014 Quarterly Report No. 1.pdf
|
4/24/2014 |
9/12/2019 |
VSC Ordinance Proposed Amendment.pdf
|
4/4/2014 |
9/12/2019 |
Amendments to Volume Sewer Customer (VSC) Program and VSC Ordinance.pdf
|
3/14/2014 |
9/12/2019 |
2013 Unpermitted Discharges Contingency Plan.pdf
|
12/23/2013 |
9/12/2019 |